Jeffrey St and Golf Links Rd Reseal
.

Jeffrey St and Golf Links Rd Reseal

Jeffrey St Lobethal and Golf Links Rd Stirling Road Reseal

Council to Undertake Warm Mix Asphalt Trials with aim of reducing Carbon Footprint

In early April Council will be undertaking the application of 'Warm Mix' Asphalt to two of its roads.

The warm mix asphalt surfacing will be applied to two local roads:

  • Jeffrey St Lobethal (entire length of street)
  • Golf Links Rd (from start of road to Golf Links Close)

Warm Mix asphalt allows the bitumen surfacing to be laid at a lower temperature and with recycled materials (from old road seals) - which means lower carbon emissions for the construction of the road seal and less waste materials to landfill.

The warm mix trials will be laid on Golf Links Road and Jeffrey St which both involve reshaping of the road to improve the surface, and a 30mm thick hotmix bitumen overlay. Council will monitor the installation of the warm mix with the view of using it for future sealing projects.

For more information on warm mix asphalt and the lower carbon emissions Council can aim towards in conjunction with its bitumen contractor please visit:

http://www.boral.com.au/ProductCatalogue/product.aspx?product=2261

Two brochures both on road construction and warm mix asphalt can be downloaded below:

Warm Mix Asphalt Brochure (699 kb)

Warm Mix Asphalt Information (978 kb)

 
Navigation