DO I NEED APPROVAL?
Development approval is required for a new rainwater tank or solar panels, carport, shed, garage or verandah unless it is not within the Hills Face Zone or a State or Local Heritage Place.
Further exemptions for RAINWATER TANKS
- The tank forms part of the roof drainage system
- The total floor area does not exceed 10m²
- Located wholly above ground
- No part is higher than 4m above the natural surface of the ground
Further exemptions for SOLAR PANELS
- The system comprises solar photovoltaic panels that have a total weight not exceeding 100kg
- Panels (and associated components) do not overhang any part of the roof
- Panels are fitted parallel to the roof with the underside surface of the panel being not more than 100mm above the surface of the roof
- Panels are installed by a person who holds an accreditation under a scheme recognised by the Minister
If installed on a Local Heritage Place, no part of the system, when installed, will be able to be seen by a person standing at ground level in a public street.
CHECKLISTS
Structures that meet certain criteria do not require Development Plan Consent, but do require Building Rules Consent.
Above-ground water tanks
Underground water tanks
Solar panels
Other structures require both Development Plan Consent and Building Rules Consent.
Above-ground water tanks
Underground water tanks
Solar panels
APPLICATION FORM
Click here to download a Development Application form (PDF)
The PDF can be printed and completed by hand, or completed within the document's fillable fields